Download Print this page

Weekly Preventive Maintenance - Kodak X-Omat 5000 RA PROCESSOR Preventive Maintenance

Hide thumbs Also See for X-Omat 5000 RA PROCESSOR:

Advertisement

Section 1: Weekly Preventive Maintenance
Important
The operator of the PROCESSOR should perform the preventive maintenance procedures in this section weekly.
DETECTOR
CROSSOVER
DEVELOPER
RACK
CROSSOVER
CLEANING
YOKE
H148_0187HCB
H148_0187HA
[1] De-energize the PROCESSOR.
[2] Remove the TOP COVER.
[3] Remove the EVAPORATION COVERS.
[4] Disconnect and remove the YOKE from the CROSSOVERS.
[5] Remove:
a. all CROSSOVERS
b. WASH RACK
[6] Rinse the 3 CROSSOVERS and the WASH RACK with warm water not to exceed 44[degree]C (110[degree]F).
Wipe the ROLLERS and the GUIDE SHOES with a damp, soft, synthetic sponge.
[7] Allow the DETECTOR CROSSOVER to air dry before you install it in the PROCESSOR.
[8] Check that all the ROLLERS on all the CROSSOVERS and on the WASH RACK rotate freely.
[9] Check the squareness of the CROSSOVERS and the WASH RACK. See the procedures in Adjustments and
Replacements, Publication Part No. 5B6340.
[10] Check that the CROSSOVER TROUGHS are not broken or cracked.
[11] Wipe any deposits from the processing section of the PROCESSOR.
5B6747 – January 1996
EVAPORATION
COVERS
FIXER
RACK
WASH
RACK

Weekly Preventive Maintenance

DEVELOPER/
FIXER
CROSSOVER
FIXER/WASH
CROSSOVER
SQUEEGEE
ASSEMBLY
3

Advertisement

loading