Ace RELIANCE Operation Manual page 11

Downhole sensor
Table of Contents

Advertisement

ACE RELIANCE SENSOR OPERATIONS MANUAL
4.3 Hold the TEC cable with wise grips on both ends of the groove and wiggle until the end section of the tube
breaks loose. Then remove the tube (fig 12 and fig 13).
Figure 12
Figure 13
4.4 Use the cable cutter to remove a length of the Teflon insulation as per dimensions of the ACE cable strip gauge
(fig 14)
V2.3
11 |
P a g e

Advertisement

Table of Contents
loading

Table of Contents