Briggs & Stratton Fortress 10kW Installation And Operation Manua page 36

10kw single phase air-cooled standby generator system
Hide thumbs Also See for Fortress 10kW:
Table of Contents

Advertisement

Available languages

Available languages

NOTICE If communication does not begin upon placing the
generator in AUTO, installing batteries, and pressing System
Update, the monitor may need to be re-linked. To link, follow
Steps 3 through 6.
3. Locate the MENU AND ESCAPE buttons on the
control panel (A). Press and hold for 3 seconds to
enter the linking mode.
4. "LINKING MODE" will scroll across the generator
control panel.
5. Locate and hold the SYSTEM UPDATE button (B) on
the wireless monitor for 5 seconds. All 3 LEDs will
flash until the monitor links to the generator. Once it
links, the monitor will display the current state. The
monitor will try to link for 1 minute. (This step can only
be completed when the generator is in Linking Mode).
6. Once the link has been confirmed, press the OK
button on the generator control panel to exit or the
control board will turn off linking after 5 minutes. The
generator will now communicate with the wireless
monitor.
NOTICE It may take up to 1 minute for the monitor to begin
displaying the generator status correctly.
36
A
A
AUTO
C
MENU
ESC
OFF
MANUAL
generator ready
generator power
service needed
system update
generator systems
DEALER NAME
DEALER PHONE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents