LG D005KD1N111 Installation Manual page 49

Energy storage system
Hide thumbs Also See for D005KD1N111:
Table of Contents

Advertisement

Available languages

Available languages

[Operating Test] settings
This is the last stage of mandatory settings. Before operating this product, [Operating Test] must be
done for checking all the systems are ready to run. If [Operating Test] is not proceeded, this product
does not work.
NOTE
The operating test is a step to verify the
PCS status for solar power generation and
battery charging / discharging.
It is recommended to proceed when the
battery SOC is more than 10 % and the
solar radiation amount is sufficient.
Tap [Operating Test] on [Installer Settings]. The
operating test menu is displayed.
You should perform 4 operating tests. To start
the test, tap [ALL] to start all the operating test
automatically.
You can also run tests separately by tapping
[START] on each test.
It is recommended to run all the tests at once
using [ALL] button rather than tests separately.
Charging (from Grid) :
The operating test for battery
charging through grid.
Charging (from PV) :
The operating test for battery
charging through PV.
Discharging:
The operating test for battery
discharging to grid.
Inverter :
The operating test for
converting PV' s DC power to AC
power.
The result is displayed when each test is
completed. When there is no problem with
the test, [Success] is displayed. When [Fail] is
displayed, tap each test result to display the
detailed information. Check and solve the error
referring to the error code in the information, and
perform the test again. For information on the
error code, refer to page 63.
Settings
49
3

Advertisement

Table of Contents
loading

Table of Contents