Van Walt Rain Gauge Operating Instructions Manual page 10

Table of Contents

Advertisement

VAN WALT
Monitoring your needs
10.Re-place the O-ring (that was removed in step 7) in the seat of the
e+ logger
To continue installation for:
• IRDA-readout: step 11 till 14
• Communication cable: step 15 till 18
11.Screw the logger nut on the e+ logger (or use the optional protective cap) and turn it hand
tight. It is also possible to use the protective cap with eye again, however it must be removed
when reading out the logger.
12.Connect the sensor connector to the e+ logger and screw it handtigth with the ring nut.
Sensor connector
Van Walt Ltd | Prestwick Lane | Grayswood | Haslemere | Surrey | GU27 2DU | Tel. 01428 661 660 | Fax. 01428 656 808 | www.vanwalt.com
Rain Gauge
Logger nut
Operating Instructions
Protective cap (optional)
Ring nut
e+ logger
10

Advertisement

Table of Contents
loading

Table of Contents