Download Print this page

ABB Emax 2 IEC 60947 Manual page 17

Retrotting kit between emax 2 e2.2, e4.2, e6.2 and entelliguard g env 1, env 2, env 3 m-pact plus/m-pact frame size 1, size2 fixed circuit breakers

Advertisement

- Installare i terminali sull'interruttore .
- Installare i terminali sull'interruttore .
23
- Install the terminals to the breaker
- Install the terminals to the breaker
- Installieren Sie die Klemmen am Leistungsschalter
- Installieren Sie die Klemmen am Leistungsschalter
- Installer les prises sur le disjoncteur
- Installer les prises sur le disjoncteur
- Instale los terminales al interruptor
- Instale los terminales al interruptor
5K
5D
20.5Nm(15.1 lb ft)
ROTATE THE UPPER TERMINAL BY 180°
AND ASSEMBLE LOWER TERMINAL
20.5Nm(15.1 lb ft)
346
347
5K
5D
RF Env3(G,L)-F 5000 HR 3P->E6.2(H,V,X) 5000
348
348
(17)
TERMINALE SUPERIORE
UPPER TERMINAL
OBERE ANSCHLUSS
BORNE SUPÉRIEURE
TERMINALES SUPERIOR
347
346
TERMINALE INFERIORE
LOWER TERMINAL
UNTERE ANSCHLUSS
BORNE INFÉRIEUR
TERMINALES INFERIOR

Advertisement

loading