Download Print this page

ABB Emax 2 IEC 60947 Manual page 10

Retrotting kit between emax 2 e2.2, e4.2, e6.2 and entelliguard g env 1, env 2, env 3 m-pact plus/m-pact frame size 1, size2 fixed circuit breakers

Advertisement

- Smontare le staffe esistenti
8
- Remove the existing brackets
- Befestigungbügeln ausbauen
- Démonte les supports de montage existants
- Desmontar los soportes de montaje existentes
9
- Montare le nuove staffe
- Assemble new brackets
- Montieren Sie die neuen Befestigungbügeln
- Ajuster les nouveaux supports
- Installare le piastre di adattamento sull'interruttore.
10
- Install the Adapter plates to the breaker.
- Installieren Sie die Adapterplatten am Leistungsschalter.
- Installer les plaques d'adaptateur sur le disjoncteur
- Instale las placas adaptadoras en el interruptor.
8.5Nm(6.3 lb ft)
5A
RF M-PACT Plus /M-PACT Frame size 1(S,N,H)-F 2500 HR ->E2.2(B,N,S,H) 2500
RF M-PACT Plus /M-PACT Frame size 1(S,N,H)-F 2500 HR ->E2.2(B,N,S,H) 2500
1A
RF M-PACT Plus /M-PACT Frame size 1(S,N,H)-F 2500 HR ->E2.2(B,N,S,H) 2500
145
145
145
RF Env1(S,N,H)-F 2000 HR->E2.2 (B,N,S,H) 2000
RF Env1(S,N,H)-F 2000 HR->E2.2(B,N,S,H) 2000
1C
RF Env1(S,N,H)-F 2000 HR >E2.2(B,N,S,H) 2000
145
145
145
145
145
(10)
1B

Advertisement

loading