Page 1
511-113 Vault Bar Page 1 of 1 Rev 8/5/08 IMPORTANT PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY. All equipment must be installed in accordance with these instructions. Check your shipment against Bill of Lading and Parts list. Any missing or broken parts must be reported to your distributor within 10 days of receipt of your order.
Page 2
511-113 Vault Bar Page 2 of 2 Rev 8/5/08 GENERAL USE/FALL ZONE & FOOTING RECOMMENDATIONS Use/Fall Zones should extend a minimum of 6 Feet in All Directions from the Perimeter of the Equipment Ground Space. This are should be covered with the required amount of Resilient Safety Surfacing Material.
Page 3
511-113 Vault Bar Page 3 of 3 Rev 8/5/08 GENERAL ASSEMBLY INSTRUCTIONS: Only hand-tighten nuts & bolts on initial assembly. Final tightening should be done EVENLY after final assembly when unit has been plumbed & leveled. After assembly is complete, ANY ENDS OF BOLTS PROTRUDING BEYOND NUTS SHOULD BE CUT OFF AND/OR PEENED OVER TO REMOVE ANY SHARP EDGES.
Need help?
Do you have a question about the Vault Bar and is the answer not in the manual?
Questions and answers