Download Print this page

Advertisement

Quick Links

TOOLS REQUIRED
1/2" SOCKET WRENCH
KNIFE
NOTE:
IF YOU PURCHASED A COMPLETED BROADCAST SPRAYER,
FOLLOW THE SPOT SPRAYER MANUAL AND MOUNT KIT
ASSEMBLY INSTRUCTIONS BEFORE YOU COMPLETE BOOM
ASSEMBLY STEPS.
1.
PARTS
None
For each Nozzle Body, insert a Strainer, Gasket and Deflector Fan
Nozzle as shown here.
Push Nozzle Cap onto the Nozzle Body and twist to secure it.
Repeat for remaining Nozzle.
INCLUDED
COMPONENTS
7' Boom Assembly (1)
34-140052-P
Ball Check Strainer (2)
NS-50BC
S
PRAYING
IMPLE
MOBILE SPRAY ASSISTANT
INTEGRATE YOUR SPRAY EQUIPMENT AND ACREAGE. CALCULATE YOUR NEEDED LIQUID AND APPLICATION SPEED.
2.
Installs Nozzles, Strainers & Caps
Extend the Boom Arms and align the end holes as shown.
Insert the ¾" Bolts through the holes and secure with Flange
Nuts. Tighten with Socket Wrench.
HAVING TROUBLE? CALL SUPPORT AT: 320.340.6464
Boom Upright Bracket (2)
Deflector Nozzle (2)
31-100160
DF3.0
Deflector Nozzle Cap (2)
Gasket (2)
G-8253051
G-G00002020
PARTS
1" Bolts (6)
Flange Nuts (8)
33-100116
33-100113
NOTE: ¾" Bolts will be
pre-installed onto Boom
Assembly.
Connects Boom Arms

Advertisement

loading

Summary of Contents for Master MFG SSBK-240

  • Page 1 HAVING TROUBLE? CALL SUPPORT AT: 320.340.6464 INCLUDED COMPONENTS TOOLS REQUIRED 7’ Boom Assembly (1) Boom Upright Bracket (2) Deflector Nozzle (2) 1” Bolts (6) Flange Nuts (8) 34-140052-P 31-100160 DF3.0 33-100116 33-100113 Ball Check Strainer (2) Deflector Nozzle Cap (2) Gasket (2) NS-50BC G-8253051...
  • Page 2 Bolts and Flange Nuts. Tighten with Socket Wrench. Boom Cap. Use remaining 1” Bolts and Flange Nuts to install Boom Thread the Boom Hose to the Shut-Off Valve. Assembly with Boom Upright Brackets to Mount Kit. SSBK-240 BOOM TROUBLESHOOTING SSBK-240 BOOM BREAKDOWN Part Number Description PROBLEM...