Page 1
511-152 STEPPING STONES INSTALLATION INSTRUCTION INSTALLATION DETAILS Recommended crew (Adult): 2 Installation time: 1 (2 man hrs) User age:2-5 for up to a 20” deck 5-12 for up to a 36” deck Use zone: see Special Safety Notes ...
511-152 STEPPING STONES INSTALLATION INSTRUCTION PARTS LIST PART # DESCRIPTION 903-271 Stepping Stone Leg 435-659 Stepping Stone Molded set of 5 1 set 5/16” x 1” Button Head Bolts 116-530 5/16” Flat Washers 316-501 NOTE: Keep a copy of these instructions on file to assist you with maintenance and replacement parts.
Page 3
511-152 STEPPING STONES INSTALLATION INSTRUCTION FOOTING INFORMATION The stepping stone footing depth is unique when compared to other footings. The footing varies based on your layout of the individual steps. Follow the instructions in the installation steps and ensure that you maintain proper spacing and elevation requirements between the steps.
Page 4
511-152 STEPPING STONES INSTALLATION INSTRUCTION July 30, 2014...
INSTALLATION TIPS & TROUBLE SHOOTING Paint – Electrostatically applied & oven cured powder coat SportsPlay Equipment Inc. recommends pre-drilling the holes in the post when attaching a four-hole bracket with a Hardware – Stainless steel & tamper resistant number #7 drill bit.
511-152 STEPPING STONES INSTALLATION INSTRUCTION BEFORE YOU BEGIN In addition to the components on the packing list you will need a a shovel or post hole digger, cement, drill with a #7 drill bit, 9/16” Detail A wrench, tape measure, dry erase marker, level and blocking material to support the Stepping Stone Legs.
Page 7
511-152 STEPPING STONES INSTALLATION INSTRUCTION INSTALLATION STEPS CONTINUED __6) Install Stepping Stone Plastic Parts: After the cement has dried you can install the Stepping Stone Plastic parts. You will need the 5/16” x 1” bolts (3), 3/8” Flat Washers (4). Place one 5/16”...
Need help?
Do you have a question about the 511-152 and is the answer not in the manual?
Questions and answers