SportsPlay 511-152 Installation Instruction

Stepping stones

Advertisement

INSTALLATION DETAILS
 Recommended crew (Adult): 2
 Installation time: 1 (2 man hrs)
 User age:2-5 for up to a 20" deck
5-12 for up to a 36" deck
 Use zone: see Special Safety Notes
 Weight: 110 lbs
SURFACING: Use of safety surfacing in compliance with
ASTM specification F1292 is required.
MAINTENANCE:
 As the owner of the playground you are responsible for
maintenance of the equipment and play area. A
maintenance schedule must be developed and the
equipment inspected frequently. A maintenance section
that includes component specific maintenance
requirements is included at the end of this manual.
 Be sure to inspect surfacing for foreign objects that could
cause injury and that sufficient surfacing is in place in
accordance with ASTM and CPSC standards.
July 30, 2014
511-152 STEPPING STONES
INSTALLATION INSTRUCTION
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 511-152 and is the answer not in the manual?

Questions and answers

Summary of Contents for SportsPlay 511-152

  • Page 1 511-152 STEPPING STONES INSTALLATION INSTRUCTION INSTALLATION DETAILS  Recommended crew (Adult): 2  Installation time: 1 (2 man hrs)  User age:2-5 for up to a 20” deck 5-12 for up to a 36” deck  Use zone: see Special Safety Notes ...
  • Page 2: Parts List

    511-152 STEPPING STONES INSTALLATION INSTRUCTION PARTS LIST PART # DESCRIPTION 903-271 Stepping Stone Leg 435-659 Stepping Stone Molded set of 5 1 set 5/16” x 1” Button Head Bolts 116-530 5/16” Flat Washers 316-501 NOTE: Keep a copy of these instructions on file to assist you with maintenance and replacement parts.
  • Page 3 511-152 STEPPING STONES INSTALLATION INSTRUCTION FOOTING INFORMATION  The stepping stone footing depth is unique when compared to other footings. The footing varies based on your layout of the individual steps. Follow the instructions in the installation steps and ensure that you maintain proper spacing and elevation requirements between the steps.
  • Page 4 511-152 STEPPING STONES INSTALLATION INSTRUCTION July 30, 2014...
  • Page 5: Specifications

    INSTALLATION TIPS & TROUBLE SHOOTING  Paint – Electrostatically applied & oven cured powder coat  SportsPlay Equipment Inc. recommends pre-drilling the holes in the post when attaching a four-hole bracket with a  Hardware – Stainless steel & tamper resistant number #7 drill bit.
  • Page 6: Before You Begin

    511-152 STEPPING STONES INSTALLATION INSTRUCTION BEFORE YOU BEGIN In addition to the components on the packing list you will need a a shovel or post hole digger, cement, drill with a #7 drill bit, 9/16” Detail A wrench, tape measure, dry erase marker, level and blocking material to support the Stepping Stone Legs.
  • Page 7 511-152 STEPPING STONES INSTALLATION INSTRUCTION INSTALLATION STEPS CONTINUED __6) Install Stepping Stone Plastic Parts: After the cement has dried you can install the Stepping Stone Plastic parts. You will need the 5/16” x 1” bolts (3), 3/8” Flat Washers (4). Place one 5/16”...

Table of Contents