Chain Lock; Commissioning; General; Load Chain - HADEF 59/18 Installation, Operating And Maintenance Instructions

Safety lever hoist
Table of Contents

Advertisement

 Release the brake by setting down the load.
 OR: Turn the switching pin to position "Lowering" and release the hand lever with a strong jerk in direction
"▼".
7.3

Chain lock

During standstill periods under load are tension, the unit should additionally by secured with the chain lock.
Push the chain lock herefore up to straight in front of the hoist.
Before starting to work with the hoist again, push the chain lock to the chain end again.
Positioning of the chain lock:
 Push the chain bar (2).
 Push the chain lock (1) to the necessary
position.
 Let loose the chain bar (2) and let the chain
lock in place.
8

Commissioning

8.1

General

Should the unit be used in Germany:
Please observe the validated, national accident prevention regulations.
For other countries:
Inspections as above. Please observe the national rules and regulations and the instructions in this manual!
NOTICE!
Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a "qualified
person" before putting into operation for the first time.
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley
movement, must be tested by a "licensed qualified person" before putting in operation.
An exception is "hoists ready for operation" acc. validated national regulations with EU-declaration of
conformity.
Definition "qualified person" (former expert)
A "qualified person" has learned, due to occupational training and experience and the job that the person has
done, the skills needed to tests the material for one's work.
Definition "licensed qualified person" (former approved expert)
A "licensed qualified person" has, due through special occupational training, knowledge about testing of the
material for one's work and knows the national accident prevention regulations and other prescriptions and
technical regulations. This person must test the material for one's work regularly with regard to design and
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS).
8.2

Load chain

 Before commissioning the load chain must be aligned and oiled.
 For the first commissioning of motorized hoists, chain oil is supplied with the delivery.
 Move safety note and fixing wire away from the chain.
CAUTION!
Do not use grease for lubrication of load chain.
Without lubrication, manufacturer's warranty and/or liability will be void.
12
Illustration 13
5.52.159.00.01.04

Advertisement

Table of Contents
loading

Table of Contents