Connecting The Mains Unit; Setting Up And Aligning The Scale - Seca 701 Instruction Manual And Guarantee

Hide thumbs Also See for 701:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 17

Connecting the mains unit

The connection socket for the mains unit is in the base of the scale.
You must check before connecting the equipment whether the AC voltage given
on the mains unit matches the local mains voltage given on your electricity me-
ter.
– Carefully tilt the scale to one side so that
the base of the scale is accessible.
– Plug the latching plug of the mains unit
into the connection socket in the base
of the scale.
– Stand the scale back up again.
– Connect the mains unit to a power
socket.
Note: the mains unit can also be used with the batteries in place without the scale
or batteries being damaged.

4. Setting up and aligning the scale

– Place the scale on a level surface.
– Undo the locknuts using the four foot
screws (1).
– Align the scale by undoing the foot
screws. The air bubble in the spirit level
must be right in the centre of the
circle (2).
– Then re-tighten the locknuts (3).
– Ensure that only the feet of the scale are
in contact with the floor. The scale may
not be in contact at any other point.
Important!
The alignment of the base of the scale
must be checked and corrected if nec-
essary every time the location of the
scale is changed.
20
scale from
mains unit
underneath
3 .
1 .
2 .
spirit level
plug-in

Advertisement

Table of Contents
loading

Table of Contents