Linear buffer power supply unit grade 2. (12 pages)
Summary of Contents for Pulsar HPSB 11A12E
Page 1
HPSB 11A12E v.1.0 HPSB 13,8V/10A/65Ah Buffer, switch mode power supply unit. Edition: 8 from 24.10.2016 Supercedes the edition: 7 from 11.08.2014...
Page 2
GREEN POWER www.pulsar.pl HPSB11A12E Features: LED indication DC 13,8V/10A uninterruptible power supply protections: fitting battery: 65Ah/12V wide range of mains supply: 176÷264V SCP short-circuit protection OVP overvoltage protection high efficiency 83% ...
Page 3
GREEN POWER www.pulsar.pl HPSB11A12E 7. Buffer power supply unit HPSB 13,8V/2x12V/8x1A/65Ah. - HPSB11A12E + 2xRN500(13,8V/12V) + 2xLB4 8x1A (AWZ575 or AWZ576) + 65Ah 8. Buffer power supply unit HPSB 13,8V/5x5V÷7,4V/5x2A/65Ah. - HPSB11A12E + 5xDCDC20 (5V÷7,4V/5x2A) + 65Ah 9. Buffer power supply unit HPSB 13,8V/3x5V÷7,4V/3x2A/65Ah.
Page 4
GREEN POWER www.pulsar.pl HPSB11A12E Fig.2. The view of the PSU.
Page 5
GREEN POWER www.pulsar.pl HPSB11A12E 1.4 Specifications: - electrical parameters (tab.3) - mechanical parameters (tab.4) - operation safety (tab.5) - operating parameters (tab.6) Electrical parameters (tab. 3). PSU type A (EPS - External Power Source) 176÷264V AC Mains supply Current up to 1.4A@230VAC...
Page 6
GREEN POWER www.pulsar.pl HPSB11A12E Operation safety (tab.5). Protection class PN-EN 60950-1:2007 I (first) Protection grade PN-EN 60529: 2002 (U) IP20 Electrical strength of insulation: - between input input and output circuits of the PSU (I/P-O/P) 3000 V/AC min. - between input circuit and PE protection circuit (I/P-FG) 1500 V/AC min.
Page 7
GREEN POWER www.pulsar.pl HPSB11A12E 2.2 Installation procedure. 1. Before installation, cut off the voltage in the 230V power supply circuit. 2. Mount the PSU in a selected location and connect the wires. 3. Connect the power cables (~230Vac) to L-N clips of the PSU. Connect the ground wire to the clip marked by the earth symbol PE.
Page 8
CAUTION! The power supply unit is adapted for cooperation with the sealed lead-acid batteries (SLA). After the operation period they must not be thrown but recycled according to the applicable law. Pulsar Siedlec 150, 32-744 Łapczyca, Poland Tel. (+48) 14-610-19-40, Fax. (+48) 14-610-19-50 E-mail: biuro@pulsar.pl, sales@pulsar.pl http:// www.pulsar.pl, www.zasilacze.pl...
Need help?
Do you have a question about the HPSB 11A12E and is the answer not in the manual?
Questions and answers