Burner Calibration; Firing Output; 2Nd Stage Output - Riello RS 190 Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

Available languages

Available languages

Burner off
Burner on
(A)
1
2
1st stage
2nd stage

BURNER CALIBRATION

The optimum calibration of the burner requires
an analysis of the flue gases at the boiler outlet.
Adjust successively:
1 - First firing output
2 - 2nd stage burner output
3 - 1st stage burner output
4 - Intermediate outputs between 1st and 2nd stage
5 - Air pressure switch
6 - Minimum gas pressure switch

1 - FIRING OUTPUT

According to EN 676 Regulations:
D469
Burners with max. output up to 120 kW
Firing can be performed at the maximum opera-
tion output level. Example:
• Max. operation output
• Max. firing output
Burners with max. output above 120 kW
Firing must be performed at a lower output than
the max. operation output. If the firing output
does not exceed 120 kW, no calculations are
required. If firing output exceeds 120 kW, the
regulations prescribe that the value be defined
according to the control box safety time "ts":
• for "ts" = 2s, firing output must be equal to or
lower than 1/2 of max. operation output.
• For "ts" = 3s, firing output must be equal to or
lower than 1/3 of max. operation output.
Example: MAX operation output of 600 kW.
Firing output must be equal to or lower than:
• 300 kW with "ts" = 2s
• 200 kW with "ts" = 3s
In order to measure the firing output:
- disconnect the plug-socket 6)(A)p.3 on the
ionization probe cable (the burner will fire and
then go into lock-out after the safety time has
elapsed).
- Perform 10 firings with consecutive lock-outs.
- On the meter read the quantity of gas burned.
This quantity must be equal to or lower than
the quantity given by the formula, for ts = 3s:
Example: for gas G 20 (9.45 kWh/Sm
Max. operation output: 600 kW corresponding to
63.5 Sm
After 10 firings with lock-outs, the delivery read
on the meter must be equal to or lower than:
63.5 : 360 = 0,176 Sm

2 - 2ND STAGE OUTPUT

2nd stage output of the burner must be set
within the firing rate range shown on page 4.
In the above instructions we left the burner run-
ning in 1st stage operation. Now set switch 2)(A)
to the 2nd stage position: the servomotor will
open, simultaneously, the air gate valve and the
gas butterfly valve to 90°.
Gas calibration
Measure the gas delivery at the meter.
A guideline indication can be calculated from the
tables on page 5, simply read off the gas pres-
sure on the U-type manometer, see fig.(C) on
page 12, and follow the instructions on page 5.
- If delivery needs to be reduced, diminish out-
let gas pressure and, if it is already very low,
slightly close adjustment valve VR.
- If delivery needs to be increased, increase
outlet gas pressure.
13
: 120 kW
: 120 kW
3
Sm
/h
(max. burner delivery)
360
3
/h.
3
3
):

Advertisement

Table of Contents
loading

This manual is also suitable for:

378581420011705

Table of Contents