2. Connect the bipolar black cable with prods to the boiler's M2 board (fig. 6).
Boilers from inside
Fig. 6
3. Connect the probe wiring and thermostat to CN6 connector of BE08
Connect the prods to the M10 boiler board (fig. 7).
Connect the shielded cable connector (on the
thermostat.
Fig. 7
Connection to the
BAG
3
MIX sensor
BAG
Boilers from inside
Boilers from outside
MIX FAMILY COND
3
part) to the NTC probe and the other to the
Boilers from outside
Connection to the
BAG
MIX sensor
3
33