Getting Started; Unpacking - Agilent Technologies Cary 630 FTIR User Manual

Table of Contents

Advertisement

Unpacking

To unpack your spectrometer system:
1
Agilent Cary 630 FTIR Spectrometer User's Guide

2. Getting Started

Unpacking
Installation
Components
Connecting Power
Environment
MicroLab PC software
Turning On the Instrument
Turning Off
Performance Verification
After receiving the Agilent Cary 630 FTIR delivery, do not
immediately open the shipping container. Instead, place the
shipping case in a room-temperature environment and allow
several hours for the contents of the container to reach the room
ambient temperature. This is to avoid unnecessary condensation
on the components prior to the initial setup and installation
process.
Your Cary 630 FTIR has been packed to ensure that it arrives at
your facility ready to go to work. Custom foam-in-place inserts
protect the instrument from damage during travel. Whenever your
instrument is shipped via common carrier, it needs to be re-
packed in the original shipping container. Using the original
shipping container, your Cary 630 can be removed and re-packed
in its container in a matter of seconds, while maintaining
instrument security. Shipping the Cary 630 FTIR in packaging
other than the original shipping container will void the warranty.
Getting Started
11
13
13
14
16
16
16
17
17
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents