Beko DRYPOINT XFi ecoIntelligent Series Installation And Operation Manual page 26

Heated blower purge regenerated dryer
Table of Contents

Advertisement

Step 5: Start Vessel B Cooling Period - Cooling (86 minutes)
The heater turns off while the blower remains on and
cools the heater. After the set temperature is
reached, the blower turns off and the purge valve
opens and additional desiccant bed cooling takes
place. At the end of this step the adsorption material
of vessel B is completely regenerated.
Step 6: Vessel B Regeneration Valve Closes - Repressurization
(4 minutes)
Vessel B Regeneration exhaust valve closes, thus the
vessel is repressurized to full working pressure.
Purge valve closes once repressurization is complete.
DRYPOINT XFi 1000 manual_revA EN
26

Advertisement

Table of Contents
loading

Table of Contents