Larzep HEP0020 Instructions & Maintenance Sheet

Larzep HEP0020 Instructions & Maintenance Sheet

Electric test pumps

Advertisement

Quick Links

INSTRUCTIONS & MAINTENANCE SHEET  
ELECTRIC TEST PUMPS 
 
 
 
 
 
 
HEP0020
LARZEP, S.A.
Avenida Urtiaga, 6 
48269 Mallabia, Spain 
Tel.  +34  943 171200 
Fax. +34  943 174166 
e‐mail: info@larzep.com 
www.larzep.com
 
 
 
 
 
 
 
 
 
 
V01.2019 

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HEP0020 and is the answer not in the manual?

Questions and answers

Summary of Contents for Larzep HEP0020

  • Page 1         INSTRUCTIONS & MAINTENANCE SHEET     ELECTRIC TEST PUMPS      HEP0020                 LARZEP, S.A. Avenida Urtiaga, 6  48269 Mallabia, Spain  Tel.  +34  943 171200  Fax. +34  943 174166  e‐mail: info@larzep.com    www.larzep.com V01.2019 ...
  • Page 2 Instructions and Maintenance Sheets  Electric Test Pump “HEP0020”  DECLARATION OF CONFORMITY      2 ...
  • Page 3 Please note that if the equipment is disassembled or serviced by anyone other than an authorized service dealer or  by LARZEP, S.A., this guarantee is rendered null and void.  In the event of a warranty claim, return the equipment to LARZEP, S.A. or the authorized dealer which sold you the  hydraulic  equipment.  LARZEP,  S.A.  will  repair  or  replace  the  faulty  equipment,  whichever  is  deemed  most  appropriate.  LARZEP,  S.A.  shall  not  be  held  liable  for  any  consequential  damages  or  losses,  which  may  occur  as  a  result of faulty equipment.    BEFORE USING THE EQUIPMENT AND ESSENTIAL SAFETY REQUIREMENTS ...
  • Page 4 Instructions and Maintenance Sheets  Electric Test Pump “HEP0020”  ASSEMBLY AND OPERATING  INSTRUCTIONS  ‐ The  components  are  shipped  unassembled  to  prevent  breakage  or  unnecessary  bulk  during  transport  or  the  stockage in warehouse. Before starting operations, check if the pump has been labelled with serial number and  technical data.  Keep package for further transports or stockage.     Ensure that all the equipment and accessories are suitable for the maximum working pressure.  Before starting any operation, clean the tank to eliminate any residue or waste.  ‐ Place the equipment on a flat and solid area.  ‐ Assembly all components. The pump is supplied with a 1.5 metres hose, glycerin pressure gauge ø60 and control  valve.  ‐ Before operating the pump always make sure pipe connections are clean and fully tightened up; all accessories  must  be  fitted  correctly  and  not  damaged:  suction  tube  with  nut  and  filter,  pressure  gauge  and  hose  for  high ...
  • Page 5 Instructions and Maintenance Sheets  Electric Test Pump “HEP0020”  FILLING AND POURING  ‐ Verify that the liquid in the tank is compatible with the characteristics of the pump.  ‐ Insert  the  suction  and  discharge  pipes  into  the  container  to  be  filled  or  poured.  High  pressure  pipe  should  be  placed in the tank where liquid will be poured or connect to the system to be filled (i.e. solar panels).  ‐ Before staring the pump, move the regulating valve (blue) to the 'BYPASS' position, completely open.  MAINTENANCE   ‐ To avoid damage to the pump, clean it after its use. For that, run the pump with clean water under pressure for a  few minutes. Then empty the pump and leave it drying for during some minutes.  ‐ Avoid  frozen  water  inside  the  pump,  it  will  damage  the  pump  and  the  joints.  In  case  of  frost  hazard,  empty ...
  • Page 6 Instructions and Maintenance Sheets  Electric Test Pump “HEP0020”      The pump must always be handled and repaired by qualified personnel.       SPARE PARTS          6 ...

Table of Contents