Operation; Starting From A Non-Powered Status - ABB FlexLoader Applications Manual

Standard safety center
Table of Contents

Advertisement

7 Operation

7.1 Starting from a non-powered status

Application manual - FlexLoader Standard Safety Center
3HAC051769-001 Revision: E
1 Turn on the main power supply. Wait until all devices have started up.
2 Perform a power on safety check:
Press and restore at least one internal FlexLoader Standard Safety
Center emergency stop button.
Reset the emergency stop.
Open and close at least one internal FlexLoader Standard Safety Center
cell door.
Reset the door status by shortly turning the reset key.
Optionally, if a light curtain is present, a long light curtain reset may
be needed (0.5 s) first, followed by a second reset for the whole cell.
3 Check the function of the external emergency stop
4 Check the function of the external protective stop (if present).
DANGER
Do not continue to work until the safety circuits are functioning correctly.
© Copyright 2014-2020 ABB. All rights reserved.
7.1 Starting from a non-powered status
7 Operation
45

Advertisement

Table of Contents
loading

Table of Contents