Installation - Theben Timeguard SupplyMaster FST24 Installation & Operating Instructions Manual

Fused spur time switch
Table of Contents

Advertisement

Illuminated screen
Sets
programmes
Sets time
and date
Reset button
Power LED
Output LED
Double pole
switch
2

4. Installation

• Ensure the mains supply is switched off and the circuit supply
fuses are removed or the circuit breaker turned off.
• Connect the incoming 230V 50Hz supply and outgoing load cables
to the relevant terminals ensuring correct polarity is observed
and that all bare conductors are sleeved (see section 5.
Connection Diagram).
• A front cable exit cut-out is provided with a pre-installed
removable cover.
• If the front exiting cable cut-out is required:
1. Undo the 2 fixing screws and remove the blanking plate
(you can discard the blanking plate at this stage but keep
the 2 fixing screws).
2. Remove the cable grip from the accessory pack.
3. Using the 2 fixing screws previously removed from
the blanking plate, secure the load cable to the unit.
• Finally secure the unit to the back box with the fixing
screws provided, forming the cables during installation
to avoid any entrapment and cable damage.
BS 1362 (1"x
/
") fuse
1
4
Override until
next programme
change and
increments
displayed value
during time and
programme
setting
Boosts for 1 or
2 hours and
decrements
displayed value
during time and
programme
setting

Advertisement

Table of Contents
loading

This manual is also suitable for:

Timeguard supplymaster fst77

Table of Contents