Installation Check-Up - La Cimbali M29 Select Use And Installation

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 22
WARNING
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.
HOT WATER
for a machine with 2 groups (see the "Hot water dispensing" Chapter in the User's Manual).
STEAM (also with Turbosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.

5. Installation Check-up

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents