Download Print this page

Verkada AC41 Installation Manual page 9

4-door controller
Hide thumbs Also See for AC41:

Advertisement

VERKADA INC
INSTALLATION
Connecting a Door
3a
Connect the Lock (Dry)
or a dry setup please ensure that
Fail Safe
3b
Connect the Lock (Wet)
In a
et configuration ensure that power selection
or each door is set to the correct voltage as outlined
by the locking hardware specifications.
et it to
V C or
et it to
V C or
he AC
is rated to power
and
V locks up to
Fail Safe
C
positive goes into C
C
negative and ground wire goes into C
CONFIDENTIAL
is selected on the door power selection switch.
Volt locking hardware
Volt locking hardware
V locks up to
A
A.
Verkada Inc. 405 E 4th Ave, San Mateo, CA, 94401
sales@verkada.com
Fail Secure
WARNING!
hen connecting the lock in the
configuration ensure the negative o the
lock goes into the C
the diagra s below.
Fail Secure
C
positive goes into
C
negative and ground wire goes into C
All specifications are subject to change without notice.
Copyright © Verkada Inc . All rights reserved.
AC41 — INSTALLATION MANUAL
et
port as shown in

Advertisement

loading