Requirements for operating the room air-dependent appliance simultaneously with an air- drawing system (e.g. with a room ventilation system, centralised dust extraction system, etc.) 3.14 Boiler ventilation Technical information Dimensions - PE1c Pellet 16-22 Connections - PE1c Pellet 16-22 Technical specifications 4.3.1 PE1c Pellet 16-22 4.3.2...
Page 3
6.2.1 Permitted fuels Wood pellets 6.2.2 Non-permitted fuels 6.2.3 Heating up for the first time Decommissioning Mothballing Disassembly Disposal Notes Appendix Addresses 9.1.1 Address of manufacturer Customer service 9.1.2 Address of the installer Installation Instructions PE1c Pellet 16-22 | M2130721_en...
General 1 General Thank you for choosing a quality product from Froling. The product features a state-of- the-art design and conforms to all currently applicable standards and testing guidelines. Please read and observe the documentation provided and always keep it close to the system for reference.
The dangerous situation may occur and if measures are not observed it will lead to minor injuries. NOTICE The dangerous situation may occur and if measures are not observed it will lead to damage to property or pollution. Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Safety Qualification of assembly staff 2.2 Qualification of assembly staff CAUTION Assembly and installation by unqualified persons: Risk of personal injury and damage to property During assembly and installation: ❒ Observe the instructions and information in the manuals ❒ Only allow appropriately qualified personnel to work on the system Assembly, installation, initial startup and servicing must always be carried out by qualified personnel: - Heating technician / building technician...
ÖNORM M 7137 Compressed untreated wood – Requirements for storing pellets at the end customer’s site TRVB H 118 Technical directives for fire protection/prevention (Austria) Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Design Information Notes on standards 3.1.3 Standards for heating water ÖNORM H 5195-1 Prevention of damage by corrosion and scale formation in closed warm water heating systems at operating temperatures up to 100°C (Austria). VDI 2035 Prevention of damage hot water heating systems (Germany) SWKI BT 102-01 Water quality for heating, steam, cooling and air conditioning systems (Switzerland)
Note on standards ÖNORM H 5170 - Construction and fire protection requirements TRVB H118 - Technical directives on fire protection/prevention Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Design Information Requirements for central heating water 3.4 Requirements for central heating water Unless contrary to other national regulations, the latest versions of the following standards and guidelines apply: Austria: ÖNORM H 5195 Switzerland SWKI BT 102-01 Germany: VDI 2035 UNI 8065 Italy: Observe the standards and also follow the recommendations below:...
If the pressure is too high, air is released by means of a solenoid valve. The systems are built solely with closed-diaphragm expansion tanks to prevent the damaging introduction of oxygen into the heating water. Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Design Information Use with storage tank Pump-controlled pressure maintenance A pump-controlled pressure maintenance unit essentially consists of a pressure- maintenance pump, relief valve and an unpressurised receiving tank. The valve releases hot water into the receiving tank if the pressure is too high. If the pressure drops below a preset value, the pump draws water from the receiving tank and feeds it back into the heating system.
The flue gas temperatures (for clean systems) and additional flue gas values can be found in the technical data. The entire flue gas system (chimney and connection) must be laid out as per ÖNORM / DIN EN 13384-1 or ÖNORM M 7515 / DIN 4705-1. Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Design Information Chimney connection/chimney system 3.7.1 Connection line to the chimney The connecting piece should be as short as possible. The upward incline of the connection to the chimney should be 30 - 45° (recommended) and be insulated. Any backflow of condensation in the condensing boiler heat exchanger does not pose a problem as it will be drained through the siphon.
NOTICE! The condensate connection may not be changed or closed! NOTICE! If the drain pipe cannot be properly installed, the use of a wastewater lifting unit is recommended. Suitable systems are available from Fröling on request. Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Design Information Room air-independent operation 3.10 Room air-independent operation The PE1c Pellet has a central air connection on the back of the boiler. If appropriate supply air and flue gas connections are installed, the boiler can be classified according to EN 15035 as a type C / type C or according to DIBt as a type FC / type FC...
(maximum flow rate = 1 m/s) NOTICE! Observe the standards cited in these instructions as well as other national and local regulations! ⇨ See "Note on standards" [page 7] Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Design Information Note on installing an external combustion air supply 3.12 Note on installing an external combustion air supply NOTICE! Install the combustion air supply (piping) in accordance with the applicable standards ⇨ See "Notes on standards" [page 7] ❒ Connect supply air duct to the connection provided (external combustion air) on the pellet boiler and make sure that it is properly sealed.
❒ Make sure that the combustion air supply line and the connecting piece are properly sealed at the chimney. Any flexible aluminium pipes used for the supply air line must be protected against mechanical loads. Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Design Information Simultaneous operation with other air-drawing systems (room ventilation, cooker hood, centralised dust extraction system, etc.) 3.13.1 Room air-independent appliance The pellet boiler is suitable for room air-independent operation up to a maximum permissible room-side under-pressure of 8 Pa. Provided the permissible room-side under-pressure limit is not exceeded, there are no restrictions regarding simultaneous operation of air-drawing systems (e.g.
Recommendation: ❒ Fit a microbubble separator in the pipes to the boiler ➥ Follow the manufacturer's instructions! Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Return-air line connection DA 50 m Wash water connection (flat sealing) 3/4" ET Safety group connection 1” IT Expansion tank-membrane connection 1” IT 1. For optional pump assembly with distributor bar and T-piece Installation Instructions PE1c Pellet 16-22 | M2130721_en...
1. If the connection line and the junction to the chimney are pressure-tight, the resistance in the flue gas system at the flue gas connection on the boiler can be 10 Pascals Installation Instructions PE1c Pellet 16-22 | M2130721_en...
❒ Lift the cover on the front edge slightly and remove it towards the front ❒ Dismantle the cleaning cover on the heat exchanger ❒ Attach the crane hook to the attachment point correctly and position the boiler Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Assembly Temporary storage 5.4 Temporary storage If the system is to be assembled at a later stage: ❒ Store components at a protected location, which is dry and free from dust ➥ Damp conditions and frost can damage components, particularly electric ones! 5.5 Setting up in the boiler room 5.5.1 Remove boiler from pallet ❒...
1. Rear flue pipe connection 2. Fit the flue pipe connection to the right-hand side of the boiler 3. For distributor bars for three pump assemblies 4. Maintenance area to expand the WOS springs upwards Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Assembly Align the boiler with the floor 5.6 Align the boiler with the floor ❒ Lift the boiler up off the floor and use the adjustable feet to level it ➥ To avoid structure-borned sound transmission, the bottom of the boiler may not rest on the floor 5.7 Change the flue gas and drain pipe connection to the right side of the boiler...
Page 31
(⇨ See "Connect the connection line to the chimney" [page 36], ⇨ See "Installing the condensation drain" [page 37]) ❒ Install the side panel on the boiler ❒ Use screws to attach the angled parts to the cut-outs again Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Assembly Installing the optional pump assemblies 5.8 Installing the optional pump assemblies The following steps illustrate assembly of the distributor bar and three connections for pump assemblies. Assemble the version with two connections in the same way. ❒ Install T-pieces with flat seals on the front and rear connection of the boiler ❒...
❒ Take out the perforation (B) on the back panel and remove the burrs using a half- round file ❒ Insert the suction hoses through the cut-out and secure as described above Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Assembly Install suction hoses 5.10.1 Assembly information for hose lines < 0,5m < 0,5m R > 30cm Please note the following with regard to the hose lines used in Froling vacuum discharge systems: ▪ Do not kink the hose lines! Minimum bending radius = 30cm ▪...
➥ TIP: If stiffness occurs when trying to attach the hoses to the connectors, pour a few drops of water onto the pipe (do not use lubrication grease!) ❒ Secure the hose line with a hose clamp Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Assembly Connect the connection line to the chimney 5.11 Connect the connection line to the chimney Recommendation: Use the optional Froling connection pipe to connect to the chimney ❒ Insert seals in all components of the flue gas system ❒ Insert the boiler adapter into the flue gas pipe on the boiler and secure using a self-tapping screw TIP: Grease the seal with suitable lubricant to facilitate installation! ❒...
➥ In the process, provide a water connection (e.g. T-piece) for ½” hose (A) to manually flush the condensation drain ➥ Ensure that the flushing line can be shut off (B) ➥ Observe design information (⇨ See "Wash-down water" [page 15]) Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Assembly Hydraulic connection 5.14 Hydraulic connection 5.14.1 Direct supply of heating circuit/boiler without storage tank charge With this version, the pump assemblies including distributor bars are connected directly to the connections on the boiler. NOTICE! It is not possible to charge the storage tank when heating circuits/DHW tanks are connected directly to the boiler! PE1c Pellet wwith two heating circuits 2 heating circuit...
❒ Flexible sheathed cable must be used for the wiring; this must be of the correct size to comply with applicable regional standards and regulations. ❒ The power supply line (mains connection) must be fitted with a C16A fuse by the customer. Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Assembly Electrical connection 5.15.1 Potential equalisation ❒ The potential equalisation on the boiler base must comply with current directives, regulations and standards 5.15.2 Information on circulating pumps NOTICE According to 2012/622/EU external, wet running circulating pumps must comply with the following limit values of the Energy Efficiency Index (EEI): - Effective from 01/01/2013: Wet running circulating pumps with EEI ≤...
❒ Check that the drives and servo motors are working and turning in the right direction ❒ Check that the door contact switch is working efficiently. ❒ Check safety switch of ash box is working correctly ❒ Check the seal on the condensate drain Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Start-up Initial startup NOTICE! Check the digital and analogue inputs and outputs - See the instruction manual for the boiler controller. 6.2 Initial startup 6.2.1 Permitted fuels Wood pellets Wood pellets made from natural wood with a diameter of 6 mm Note on standards Fuel acc.
If condensation escapes during the initial heat-up phase, this does not indicate a fault. ❒ Tip: If this occurs, clean up using a cleaning rag. NOTICE! See boiler controller instruction manual for all the steps necessary to start up for the first time. Installation Instructions PE1c Pellet 16-22 | M2130721_en...
Decommissioning Mothballing 7 Decommissioning 7.1 Mothballing The following measures should be taken if the boiler is to remain out of service for several weeks (e.g. during the summer): ❒ Clean the boiler thoroughly and close the doors fully If the boiler is to remain out of service during the winter: ❒...