Froling. On commissioning by FROLING Customer Service the validity of the delivery certificate will be noted on the customer service record. Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Safety Hazard levels of warnings 2 Safety 2.1 Hazard levels of warnings This documentation uses warnings with the following hazard levels to indicate direct hazards and important safety instructions: DANGER The dangerous situation is imminent and if measures are not observed it will lead to serious injury or death.
You must ensure that staff have the protective equipment specified by accident prevention regulations. ▪ For transportation, setup and assembly: - suitable work wear - protective gloves - sturdy shoes (min. protection class S1P) Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Design Information Notes on standards 3 Design Information 3.1 Notes on standards The system must be installed and commissioned in accordance with the local fire and building regulations. Unless contrary to other national regulations, the latest versions of the following standards and guidelines apply: 3.1.1 General standards for heating systems EN 303-5 Boilers for solid fuels, manually and automatically fed...
BGBl. JG 2010 Part I No. 4. EN ISO 17225-2 Solid bio-fuel - Fuel specifications and classes Part 2: Wood pellets for use in industrial and domestic systems Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Design Information Installation and approval of the heating system 3.2 Installation and approval of the heating system The boiler should be operated in a closed heating system. The following standards govern the installation: Note on standards EN 12828 - Heating Systems in Buildings NOTICE! Each heating system must be officially approved.
❒ Avoid leaks and use a closed heating system to maintain water quality during operation ❒ When filling with make-up water, always bleed the filling hose before connecting, in order to prevent air from entering the system Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Page 12
Design Information Requirements for central heating water Advantages of prepared water: ▪ Complies with the applicable standards ▪ Less of a drop in output due to reduced limescale build-up ▪ Less corrosion due to fewer aggressive substances ▪ Long-term cost savings thanks to improved energy efficiency Permitted water hardness for the fill and make-up water in accordance with VDI 2035: Overall heat Total hardness at...
For the correct dimensions of the storage tank and the line insulation (in accordance with ÖNORM M 7510 or guideline UZ37) please consult your installer or Froling. ⇨ See "Addresses" [page 72] Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Design Information Chimney connection/chimney system 3.7 Chimney connection/chimney system EN 303-5 specifies that the entire flue gas system must be designed to prevent, wherever possible, damage caused by seepage, insufficient feed pressure and condensation. Please note in this respect that flue gas temperatures lower than 160K above room temperature can occur in the permitted operating range of the boiler.
The mouths of the air and flue gas chimney are either concentric or so close to each other that similar wind conditions apply. NOTICE! Air is supplied by an air and flue gas system! Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Design Information Air supply in the installation room Type C A boiler that is connected via its combustion air supply and flue gas outlet, with a connecting piece, to a wind protection device and a single or shared chimney. NOTICE! Air supply via an air supply line that is independent from the chimney system! NOTICE! This design requires a wind protection device.
Page 17
(maximum flow rate = 1 m/s) NOTICE! Observe the standards cited in these instructions as well as other national and local regulations! ⇨ See "Note on standards" [page 8] Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Design Information Note on installing an external combustion air supply 3.10 Note on installing an external combustion air supply NOTICE! Install the combustion air supply (piping) in accordance with the applicable standards ⇨ See "Notes on standards" [page 8] ❒ Connect supply air duct to the connection provided (external combustion air) on the pellet boiler and make sure that it is properly sealed.
❒ Make sure that the combustion air supply line and the connecting piece are properly sealed at the chimney. Any flexible aluminium pipes used for the supply air line must be protected against mechanical loads. Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Design Information Simultaneous operation with other air-drawing systems (room ventilation, cooker hood, centralised dust extraction system, etc.) 3.11.1 Room air-independent appliance The pellet boiler is suitable for room air-independent operation up to a maximum permissible room-side under-pressure of 8 Pa. Provided the permissible room-side under-pressure limit is not exceeded, there are no restrictions regarding simultaneous operation of air-drawing systems (e.g.
Recommendation: ❒ Fit a microbubble separator in the pipes to the boiler ➥ Follow the manufacturer's instructions! Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Height of flow/return connection of the heating circuits 1260 1260 Height, PE1 Pellet Unit 1810 1810 Height, electronic heating cartridge connection Height, drainage connection of DHW tank Height of the drainage connection of the boiler Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Drainage connection for the DHW tank (boiler 1/2 IT filling and drainage system are not included in delivery) Connection for E-cartridge 6/4 IT Maintenance flange with insulated magnesium protective anode Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Fuel as per EN ISO 17225 – Part 2: wood pellets Class A1 / D06 Test book number PB0730015 PB0740015 1. The technical specifications of the optional components can be found in the enclosed supplier documentation Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Technology Technical specifications Regulation (EU) 2015/1187 Energy efficiency class of boiler Energy efficiency index (EEI) of boiler Heating space annual rate of use η Energy efficiency index (EEI) of boiler and controller combined Energy efficiency class (EEI) of boiler and controller combined Regulation (EU) 2015/1189 - Emissions in [mg/m³] seasonal space heating emissions of particulate (PM)
Page 29
60 Pellet container capacity Ash box capacity Water pressure drop (ΔT = 20K) mbar 12.0 14.0 Minimum boiler return temperature Not applicable due to internal return temperature control Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Page 30
Technology Technical specifications Description PE1 Pellet 32 PE1 Pellet 35 Maximum boiler temperature setting °C Minimum boiler temperature setting Airborne sound level dB(A) < 70 Boiler class as per EN 303-5:2012 Permitted fuel Fuel as per EN ISO 17225 – Part 2: wood pellets Class A1 / D06 Test book number PB0770015...
Technology External suction module NOTICE In Germany, the following applies: ❒ Continuous supply of fuel in the boiler’s ideal output range can be achieved by using a storage tank with a minimum volume in accordance with 1. BlmSchV. In this case, no chimney calculations are required in partial load. 4.6 External suction module Measur Description...
Assembly Tools required Optionally available for PE1 Pellet Unit: Connection set for operation Pipe assembly for storage tank independent of room air loading ⇨ See "Install the connection set for ⇨ See "Expansion with pipe assembly room air-independent operation for storage loading (optional)" [page (optional)"...
❒ Follow the transport instructions on the packaging ❒ Transport components with care to avoid damage ❒ Protect components against damp ❒ Pay attention to the pallet's centre of gravity when lifting Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Positioning 5.4 Positioning If the height of the PE1 Pellet Unit prevents it from being transported as a single unit: ❒ ⇨ See "Disassembling to make transporting the PE1 Pellet Unit easier" [page NOTICE! Only remove the PE1 Pellet Unit as a last resort if it connot be transported as a single unit! Transport with fork-lift or similar lifting device ❒...
If the system is to be assembled at a later stage: ❒ Store components at a protected location, which is dry and free from dust ➥ Damp conditions and frost can damage components, particularly electric ones! Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Setting up in the boiler room 5.6 Setting up in the boiler room 5.6.1 Moving the boiler in the boiler room ❒ Position a forklift or similar lifting device with a suitable load-bearing capacity at the base frame ❒ Lift and transport to the intended position in the installation room. ➥...
❒ Cut through the reinforcing tape and lift off the cardboard box ❒ Take the componenets behind the boiler (suction module, furnace tool,…) off the pallet ❒ Remove the transport lock at the back of the boiler Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Page 40
Assembly Install PE1 Pellet ❒ Lift the boiler and pull the pallet out the front TIP: We recommend using Froling’s KHV 1400 boiler lifting system to make pallet removal easier Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com...
❒ Remove insulated door ❒ Unlock the cover by undoing the retaining screws ❒ Lift the cover on the front edge slightly and remove it towards the front Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Page 42
Assembly Install PE1 Pellet ❒ Undo the screws on the front cover plate ❒ Unlock cover plate to the right and lift off to the front ❒ Remove the protective plate from the bottom of the boiler ❒ Pull out floor insulation The Froling KHV 1400 boiler lifting system can now be used to lift the boiler off the pallet and the boiler can be transported using a forklift or similar lifting device.
❒ Lift the boiler up off the floor and use the adjustable feet to level it ➥ To avoid structure-borned sound transmission, the bottom of the boiler may not rest on the floor Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Install PE1 Pellet 5.7.4 Prepare for room air-independent operation ❒ Remove the covering grid plate on the rear of the boiler ❒ Loosen both screws (A) on the supply air connection ca. 30 mm ❒ Pull back the bracket for the supply air connection until approx. 30 mm of pipe is protruding ❒...
❒ Transport boiler to the intended position in the installation room ➥ Observe the operating and maintenance areas of the equipment in the process! Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Install the PE1 Pellet Unit 5.8.2 Align the boiler with the floor ❒ Lift the boiler using a forklift or similar lifting device with the appropriate load- bearing capacity and position the boiler underlays Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com...
5.8.3 Install boiler filling and drainage system ❒ Remove the right blanking plug from the DHW tank and seal the boiler filling and drainage system in the sleeve instead Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Install the PE1 Pellet Unit 5.8.4 Expansion with electronic heating cartridge (optional) 60-80Nm ❒ Remove the left blanking plug from the DHW tank and seal the electric heating cartridge in the sleeve instead ❒ Tighten the electric heating cartridge with the included spanner (60-80 Nm) ❒...
Page 49
❒ Push out the perforation on the cover and remove the burrs using a half-round file ❒ Secure the air connection bracket to the upper side of the frame ➥ The long pipe section points up Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Install the PE1 Pellet Unit ❒ Remove the cover plate and grill from the back panel of the boiler ❒ Loosen both screws on the air connection ❒ Pull the bracket out until it stops and secure using screws ❒...
❒ Remove the piping between the pump assembly and the ball valves ❒ Remove the anterior thermal insulation from the second pump assembly and secure the pump assembly to the frame Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Page 52
Assembly Install the PE1 Pellet Unit ❒ Fit the elbows, including seals, to the ball valves ❒ Fit the distributor, including seals, to the bottom of the pump assembly and to the elbows ➥ CAUTION: Pay attention to the directions of flow (A)! ❒...
Page 53
❒ Fit the rear panel to the frame and use two screws to secure it on the top ❒ Fit the side panel and use two screws to secure it to the frame Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Install the PE1 Pellet Unit 5.8.8 Fit the front cover ❒ Undo the screws on the right side panel and remove the side panel ❒ Remove the screws from the frame behind ❒ Insert the bolts on the included cover on the left frame and use the previously removed screws to attach to the right frame ❒...
❒ Lift the top cover slightly at the front and unhook ❒ Undo both screws at the top of the right side panel and unhook the side panel Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Page 56
Assembly Install the PE1 Pellet Unit ❒ Unplug the connectors for the following components in the controller box and pull the cable from opening (A) on the controller box: ➥ B – mixing valve for the first heating circuit on the core module ➥...
➥ If the suction module is positioned at a maximum distance of 2 m to the boiler, the power supply line can be plugged in as is. When distances are greater the power supply line must be lengthened accordingly on-site Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Page 58
Assembly Installing the discharge system ❒ Unwind the cable of the suction turbine and feed it through the opening of the housing underside ❒ Remove the protective cap on the underside of the suction module ❒ Lay the return air line from the suction point to the suction module and fix it to the pressure side (position 1) with a hose clamp ❒...
NOTICE! When connecting the lines, pay attention to equipotential bonding, ⇨ See "Assembly information for hose lines" [page 60] ❒ Install the cover plate under the suction hoses Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Installing the discharge system 5.9.3 Assembly information for hose lines < 0,5m < 0,5m R > 30cm Please note the following with regard to the hose lines used in Froling vacuum discharge systems: ▪ Do not kink the hose lines! Minimum bending radius = 30cm ▪...
➥ TIP: If stiffness occurs when trying to attach the hoses to the connectors, pour a few drops of water onto the pipe (do not use grease). ❒ Secure the hose line with a hose clamp Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Install the protective plate for the flue pipe 5.10 Install the protective plate for the flue pipe 90° ❒ Bend the cover plate on the punched edge to 90° ❒ Replace the protective plate on the rear of the boiler and attach it with screws ➥...
❒ Undo the screws on the top and remove the side panel ❒ Run the cables of all components through cut-out (A) in the back panel to the controller and plug in to the following boards Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Page 64
Assembly Electrical Connection Suction module on the pellet module FRPEM Power supply at connector in controller For pipe assembly for storage tank loading Storage tank loading pump on the hydraulic module AO-P1 FRHYU Pumpe 1 For pump assembly for second heating circuit Pump (A), mixing valve (B) and contact sensor (C) on the core module Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com...
➥ Only use special high efficiency pumps with a connection option for a control line (PDM/0-10V)! ➥ Observe the additional instructions and information on board outputs in the operation instructions for the boiler controller. Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Assembly Final installation steps 5.12 Final installation steps ❒ Insert side panel into lugs (A) and attach at the top ❒ Insert the cover at the rear and attach it with a retaining screw ❒ Place both covers on the back ❒...
❒ Bleed all the drinking water supply valves connected to the heating system in order until water starts to come out ➥ This ensures there is no air in the drinking water pipe system Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Start-up Before commissioning / configuring the boiler 6.2 Before commissioning / configuring the boiler The boiler must be configured to the heating system during initial start-up! NOTICE Optimum efficiency and efficient, low-emission operation can only be guaranteed if the system is set up by trained professionals and the standard factory settings are observed.
❒ Tip: If this occurs, clean up using a cleaning rag. NOTICE! See boiler controller instruction manual for all the steps necessary to start up for the first time. Installation Instructions PE1 Pellet 7-35 / PE1 Pellet Unit 7-20 | M1441420_en...
Decommissioning Mothballing 7 Decommissioning 7.1 Mothballing The following measures should be taken if the boiler is to remain out of service for several weeks (e.g. during the summer): ❒ Clean the boiler thoroughly and close the doors fully If the boiler is to remain out of service during the winter: ❒...
Need help?
Do you have a question about the PE1 Pellet 7-35 and is the answer not in the manual?
Questions and answers