Operating Instructions - Eaton Ulusoy HMH24-01 User Manual

Incoming-outgoing switchgear with load break switch
Table of Contents

Advertisement

Operation Instructions
Manual use and front view
PHASE CONFORMITY TEST
Lamps stay dim if phases are compliant.
Lamp lights up if phases are not compliant.
(Test device is not delivered with switchgears.)
You can use simple AVO meter as well/
CABLE TEST (when needed)
Outgoing Switchgears
In order to check cable faults.
Open LBS.
Close earthing switch.
Open switchgear front door. Place cable test
device. Reopen earthing switch.
Perform required measurements.
12
Ulusoy HMH24-01 Incoming-Outgoing Switchgear with LBS User Manual August 2020 www.eaton.com
Use the lever as shown in order to operate
the earthing switch, and charging the spring.
Serial Light
Voltage Indicator
Voltage indicator lamps must light when MV cables
are energized.
Incoming Switchgears
In order to check cable faults.
Open LBS.
De-energize the switchgear from the previous center and
earth the cables.
Close earthing switch of the switchgear.
Open switchgear front door.
Place cable test device.
After test close the door.
Reopen earthing switch.
Perform required measurements.