Dyna-Glo LPC25 Series User's Installation, Operation And Maintenance Manual page 5

Propane construction heater
Table of Contents

Advertisement

Available languages

Available languages

NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING!
Assembly Time: 10 minutes
Contents
All Models: Unit, Manual, Hose and Regulator
Assembly
LPC80 and 200 Series Include:
Upper Shell, Lower Shell and Hardware Kit With
Screws (8)
Tools Required for Assembly
All Models: Adjustable Wrench
LPC80 and LPC200 Series: Phillips head screwdriver
Slide upper shell assembly up and off lower shell.
For Technical Support or Troubleshooting, Call: 1-877-447-4768
www.ghpgroupinc.com
5

Advertisement

Table of Contents
loading

Table of Contents