Control Panel Display; Ready Signals; Warning Signals - Gaggia Brera Operating Instructions Manual

Hide thumbs Also See for Brera:
Table of Contents

Advertisement

Available languages

Available languages

CONTROL PANEL
DISPLAY

Ready Signals

• The machine is ready for brewing coffee
from bean and hot water dispensing.
Steady on
• The machine is ready for pre-ground
coffee brewing.
Steady on
• The machine is in the steam dispensing
phase.
Steady on
• The machine is in the hot water
dispensing phase.
Steady on
• The machine is brewing 1 espresso
coffee or a long coffee.
Steady on
• The machine is brewing 2 espresso
coffees or 2 long coffees.
Steady on
• The machine is programming the
amount of coffee to be brewed each
time the "
pressed.
Blinking
• 38 •
• 38 •
4219-465-04381 GAG. MAN. BRERA IT-EN-DE-FR Rev.00.indd 38
" or "
" button is

Warning Signals

• The machine is warming up to brew
coffee and dispense hot water or steam.
Blinking
• The machine is performing the rinse
cycle.
Wait until the machine stops the
operation.
Cyclic blinking
• The machine needs a descaling cycle.
Steady on
• The machine needs water circuit
priming.
Blinking
14/10/2020 14:49:27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sup 037rg

Table of Contents