Download Print this page

Starting Procedures - IAI REC-GW First Step Manual

Ec gateway unit, ec connection unit, rec terminal unit

Advertisement

4. EtherCAT (REC-GW-EC)
Refer to the instruction manuals for each field network master unit for the details.
Connector Name
EtherCAT Connector
1
Ethernet ANSI/TIA/EIA-568-B Category 5
Cable Side
and above 8P8C modular plug equipped
with shield (RJ45)
8
Ethernet ANSI/TIA/EIA-568-B Category 5
Controller Side
and above 8P8C modular Jack equipped
with shield (RJ45)
1
Pin
Signal Name
Description
No.
1
TD+
Data sending+
8
2
TD-
Data sending-
3
RD+
Data receiving+
Top View of
Connector on
4
-
Disconnected
EC Gateway
5
-
Disconnected
Unit side
6
RD-
Data receiving-
7
-
Disconnected
8
-
Disconnected
Master Unit
Slave Devices
Ethernet Straight Cable Category 5 or more
Double shielded cable braided with aluminum foil recommended
(Note) Terminal resistance is not required
5. EtherNet/IP (REC-GW-EP)
7. PROFINET IO (REC-GW-PRT)
Refer to the instruction manuals for each field network master unit for the details.
Connector Name
EtherNet/IP, PROFINET IO Connector
Ethernet ANSI/TIA/EIA-568-B Category 5
1
Cable Side
and above 8P8C modular plug equipped
with shield (RJ45)
Ethernet ANSI/TIA/EIA-568-B Category 5
Controller Side
and above 8P8C modular Jack equipped
with shield (RJ45)
8
Pin
Top View of
Signal Name
Description
No.
Connector on
EC Gateway
1
TD+
Data sending+
Unit side
2
TD-
Data sending-
3
RD+
Data receiving+
4
-
Disconnected
5
-
Disconnected
6
RD-
Data receiving-
7
-
Disconnected
8
-
Disconnected
Switching Hub
Master Unit
Ethernet Straight Cable,
Category 5 or more
Double shielded cable braided with
aluminum foil recommended
6. PROFIBUS-DP (REC-GW-PR)
Refer to the instruction manuals for each field network master unit for the details.
1
6
Remarks
Please prepare
9
separately
5
Top View of
Connector on
Applicable cable
EC Gateway
diameter
Unit side
It is recommended
to prepare a
straight STP cable
in Category 5 or
above for the
Ethernet cable.
Master Unit
REC EtherCAT Type
When using this product for the first time, make sure to avoid mistakes and incorrect wiring by referring to
the procedure below.
In this section, explains how to start up especially for REC system. Follow an instruction manual (DVD) for
each device for how to link to other devices, controllers and actuators that are linked in the network.
Check of Packed Items
Are all the delivered items present?
Remarks
Assembling REC (Linking up Units)
Please prepare
Join the units to use such as the EC Gateway Unit, EC Connection Unit and REC Terminal Unit.
separately
Installation and Wiring
* Refer to [Installation and Noise Elimination] in this first step guide
Install the controller and actuator and perform wiring according.
Applicable cable
diameter
Initial Settings (Setup of Gateway) * Gateway parameter setting tool is required
Have the settings done for the axis number setting, mode settings, field network communication speed, node addresses
(station numbers) and so on to suit to the system.
It is recommended
to prepare a
Initial Settings (Setup of ELECYLINDER) * Teaching Tool is required
straight STP cable
Establish the parameter settings for each ELECYLINDER.
in Category 5 or
above for the
Ethernet cable.
PLC (Master Unit) Baud Rate * Refer to PLC Instruction Manual.
Have the settings established for the PLC node addresses (station
numbers) and the baud rate.
Power Supply
1) Supply the power to PLC (master unit).
Communication Establishment Check
• Confirm that the communication has been established with the
LED lamp on EC Gateway Unit.
* Refer to "Troubleshooting" in this first step guide
Slave Devices
• Confirm that communication is established also on PLC (master unit).
* Refer to PLC Instruction Manual.
Check on Safety Circuit
REC-
Confirm that the stop circuit (drive source cutoff circuit) works in normal conditions.
EtherNet/IP Type
or
REC-
Now, it is succeeded to establish communication and ready for operation.
PROFINET IO Type
Move on to the system operation check and adjustment.
Red B line (Positive side)
Green A line (Negative side)
Cable
Shield
Connector Name
PROFIBUS-DP Connector
Cable Side
9-pin D-sub Connector (Male)
Please prepare separately
Controller Side
9-pin D-sub Connector (Female)
Pin
Signal Name
Description
Applicable cable diameter
No.
1
NC
Disconnected
2
NC
Disconnected
3
B-Line
Communication Line B (RS485)
4
RTS
Request for Sending
Dedicated cable for
5
GND
Signal GND (Insulation)
PROFIBUS-DP
(Type A: EN5017)
6
+5V
+5V Output (Insulation)
7
NC
Disconnected
8
A-Line
Communication Line A (RS485)
9
NC
Disconnected
Slave Devices
REC PROFIBUS-DP Type
Grounding resistance at 100 Ω or less
(Class D grounding)

Starting Procedures

No →
Contact your local IAI distributor
↓Yes
Important Check Item
• Is frame ground (FG) connected?
• Has the noise countermeasure been taken?
← Yes
Important Check Item
• Is the control sequence applicable for
the continuous mode and the system?
2) Supply the power to REC.
Check the status of LED lamps to see the
No →
cause of the error to have an appropriate
counteraction. Do the whole process from
the start if the cause of the error is not
clear.
↓Yes
No →
Check the circuit.
↓Yes
Troubleshooting (LED Display)
On REC Gateway Unit, there are the monitor LEDs for the field network and communication.
You can confirm the communication establishment and also communication errors on these LEDs.
Refer to "Names for Each Part" for the position and name of each LED lamp.
1. LED Display on EC Gateway Unit
Panel
Color
Display
Illuminating
Remarks
GN
T RUN
OR
Illuminating
GN
Illuminating
SYS
OR
Illuminating
Illuminating
STOP
RD
Illuminating
MODE
GN
Illuminating
C ERR
OR
STATUS 0
-
STATUS 1
-
2. LED Display on EC Connection Unit
Panel
Color
Display
Illuminating
GN
T RUN
OR
Illuminating
Illuminating
GN
SYS
RD
Illuminating
Illuminating
GN
Forward
End
RD
Illuminating
Illuminating
Backward
GN
End
[Field Network Communication Conditions]
1. CC-Link (REC-GW-CC)
Panel
Name
Display
STATUS 0
RUN
STATUS 1
ERR
Status
Explanation
Inside bus communication in normal conditions
Flashing
Waiting for initializing communication
Inside bus communication in error
Operating in normal conditions
Gateway alarm being generated
Stop switch on teaching pendant valid (while pressed and held)
OFF
Stop switch on teaching pendant invalid
In AUTO (automatic operation) Mode
OFF
In MANU (manual operation) Mode
Error occurred in field network
OFF
Field network operating in normal conditions
Differs depending on field network (Refer to Field Network
-
Communication Conditions from 1 to 7)
Differs depending on field network (Refer to Field Network
-
Communication Conditions from 1 to 7)
Status
Explanation
Inside bus communication in normal conditions
Waiting for initializing communication, Initializing
Flashing
communication failed
Inside bus communication in error
Servo ON
OFF
Servo OFF
Alarm being generated, stop switch on teaching pendant
valid (while pressed and held)
Movement to forward end completed
OFF
Stop
Alarm being generated
Movement to backward end completed
OFF
Stop
Color
Status
Explanation
Succeeded in refresh and polling reception
Illuminating
after getting into network, or succeeded in
refresh reception
GN
1. Not in network
2. Carrier detected for channel
OFF
3. Timeover
4. In hardware reset
1. CRC Error
2. Station number setting error at reset release
Illuminating
(65 stations or more including 0 or occupied
station number)
3. Baud rate setting error at reset release
OR
Flashing
Numbers changed from station numbers and
(Flash for
baud rate setting numbers at reset release
0.4sec)
1. Communication in normal conditions
OFF
2. In hardware reset

Advertisement

loading

This manual is also suitable for:

Rcon-ecRcon-gw-tre