Installation and operating manual
33. Tighten the screws for the hood of the control unit using
an Allen key.
1.
1.
Plug the device back in to the voltage supply.
Plug the device back in to the voltage supply.
2. 2.
Carry out commissioning, see chapter "5. Commissioning" on Page 26.
Carry out commissioning, see chapter "5. Commissioning" on Page 26.
48
Concluding work
Ø = 2 mm
M = 0,6 Nm + 10 %
DRYPOINT
M eco control
®
EN