Beko DRYPOINT M eco control DEC 1-30S Original Installation And Operation Manual page 40

Drying system
Table of Contents

Advertisement

Installation and operating manual
Description
1. Unscrew the screws from the hood of the control unit
using an Allen key.
Remove screws.
2. Open the hood of the control unit carefully to the left.
Route the ribbon cable to the left out of the cable run.
3. Undo the fixing screws and washers for the membrane 
dryer head using an Allen key and remove them.
4. Lift the control unit and perform the following work at a
clean work place.
40
Illustration
Ø = 2 mm
M = 0,6 Nm + 10 %
Ø = 4 mm
M = 2,5 Nm + 0,5 %
DRYPOINT
M eco control
®
EN

Advertisement

Table of Contents
loading

Table of Contents