RTS88 Package 07-22 Installation Instructions Table of Contents Table of contents Installation instructions Prepare frame and install closer Prepare top of door and install arm Prepare bottom of door and install pivot Install door Adjustments Door alignment Clearance adjustments (if required)
RTS88 Package 07-22 Installation Instructions Closer arm 1.2 Prepare top of door and install arm Fig.2 Header Side jamb Closer Cover plate Closer arm 1/4-20 pan head machine screws and flat washers. 1/4-20 hex head alignment screws 8852 8853...
RTS88 Package 07-22 Installation Instructions Install the door 1.4 Install door Fig.4 Header Side jamb Closer Cover plate 5/16-18 socket head cap screws Clamping block Closer arm 8852 8853 8855 8857 Hold open closer: 1.4.4 Position door at angle that coincides with the closer spindle.
RTS88 Package 07-22 Installation Instructions Adjustments - clearances 2.2 Clearance adjustments (if required) Fig.6 Header Side jamb Closer Cover plate 5/16-18 socket head cap screws Height adjustment 8852 8853 8855 8857 2.2.4 Retighten socket head cap screws. 2.2.1 If clearances differ from those shown on the template, adjust in the following manner.
Need help?
Do you have a question about the RTS Series and is the answer not in the manual?
Questions and answers