Observe the following requirements when installing the system components:
The equipment must be installed by competent personnel in accordance with the instruc-
tions. National laws and regulations must be observed.
The building installation must provide a 20 A overcurrent protection.
The installer must make a readily accessible disconnect device available.
Do not place the device next to other devices that might cause overheating.
Keep the device away from arc-generating devices such as magnetic switches and non-
fused breakers. Avoid using the device in environments where corrosive gases are pres-
ent.
To ensure an addequate air flow from natural convection install the VisuNet FLX in a loca-
tion providing a minimum clearance of 50 mm (1.96 in.) or more on the left and right sides,
50 mm (1.96 in.) or more on the rear side, and 100 mm (3.93 in.) or more above and
below the product from all adjacent structures and equipment.
Install the device with sufficient clearance to provide for cable routing and cable connec-
tors.
Included with delivery:
Preassembled VisuNet RM-, PC- or DM- FLX Panel
Items Ordered Separately:
Kit for Panel Mounting (2x horizontal brackets, 2x vertical brackets, incl. mounting nuts)
Versions
Item Number
70129836
70129837
70129838
24
Dimension
21.5"
19"
15.6"
Item Name
PM-KIT-3200-22-304-N0
PM-KIT-3200-19-304-N0
PM-KIT-3200-15-304-N0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents