Section 5. Place Unit At Location - Trane TAM7A0A24H21SB Installer's Manual

Convertible air handlers 2-5 ton
Table of Contents

Advertisement

Section 5. Place Unit at Location

5.1 Carry Unit
STEP 1 - Carry the unit to the installation location.
STEP 2 - Reassemble by reversing the steps listed
in Section 4 if disassembly was required. If cut, wire
ties that held the sensor wiring must be replaced.
Important: Under no conditions should metal strap-
ping be attached to the unit to be used as support
mechanisms for carrying or suspension purposes.
Approved carrying:
1. Hold by the cross members within the cabinet
or unit top plate and use as handles for lifting
and carrying the coil and blower sections.
Unit Top Plate
Cross Members
Cross Member
11

Advertisement

Table of Contents
loading

Table of Contents