Electrical Installation; Connection Diagram - ABB BAMU-12C Hardware Manual

Auxiliary measurement unit
Table of Contents

Advertisement

Electrical installation

Connection diagram

Default use of the connectors is shown below. For further details on wiring, see the
delivery-specific circuit diagrams.
XPOW External power input
1
24V
2
0V
24 V DC
3
SHIELD
V30
Fiber optic connections
V1T
V1T
Fiber optic connector, transmitter. Connected to the control unit of the drive.
V1R
V1R
Fiber optic connector, receiver. Connected to the control unit of the drive.
XIU
Current measurement
1
S1
U-phase current input
2
S2
U-phase current output
XIV
Current measurement
3
S3
V-phase current input
4
S4
V-phase current output
XIW
Current measurement
5
S5
W-phase current input
6
S6
W-phase current output
XU1
Voltage measurement
1
U1
U-phase voltage 1
2
-
Not connected
3
V1
V-phase voltage 1
4
-
Not connected
5
W1
W-phase voltage 1
6
-
Not connected
7
N1
Neutral 1
XU2
Voltage measurement
1
U2
U-phase voltage 2
2
-
Not connected
3
V2
V-phase voltage 2
4
-
Not connected
5
W2
W-phase voltage 2
6
-
Not connected
7
N2
Neutral 2
1)
Measuring range: ±2.5 A. Input impedance: <0.2 ohm
2)
Measuring range: ±2.0 kV peak (phase-to-phase), 1250 V rms (phase-to-phase). Maximum
voltage connected to terminals is 600/690 V (DVC C). Input impedance against virtual
ground: 1.76 Mohm.
1)
1)
1)
2)
2)
Installation 17
11

Advertisement

Table of Contents
loading

Table of Contents