Download Print this page

raumplus 800 AIR-B Series Assembly & Installation page 20

Advertisement

INSTALLATION INSTRUCTION
SECOND TOP TRACK
While adjusting the sliding door
arrange for approx. 8 mm distance
between the bottom edge of
the sliding door and floor.
2_ Hinge the front sliding door and adjust perpendicularly with the set screws - do not tighten yet.
Check the position of the top pick-up
element. Tighten the screws and
the nut firmly with two spanners.
2_ Install front sliding door, then tighten the counternuts at the top pick-up elements.
20
center of
rear top track
20

Advertisement

loading

Related Products for raumplus 800 AIR-B Series

This manual is also suitable for:

S 800 air-b