Download Print this page

raumplus 800 AIR-B Series Assembly & Installation page 19

Advertisement

INSTALLATION INSTRUCTION
BOTTOM GUIDING / SECOND TOP TRACK
Check the position of the top pick-up
element.
Tighten the screws and the nut firmly with
two spanners.
1_ Install rear sliding door, then tighten the counter nuts at the top pick-up elements.
Z
notches facing
to the top.
2_ Drill holes in ceiling / top of corpus and mount front top track horizontally (fig. w/o ceiling / corpus).
Z
brake for
top roller
water level
screws to
Insert accessories as illustrated
the bottom.
before mounting top track.
front top track
Y
Y
Y
stopper for top
track w/o brake
do not
tighten yet.
19

Advertisement

loading

Related Products for raumplus 800 AIR-B Series

This manual is also suitable for:

S 800 air-b