Step 3: Connecting Power Optimizers In Strings - SolarEdge StorEdge SE5K-RWS Installation Manual

Three phase inverter for europe and apac
Table of Contents

Advertisement

Connect the Plus (+) output connector of the module to the Plus (+) input
connector of the power optimizer.
Connect the Minus (-) output connector of the module to the Minus (-) input
connector of the power optimizer.

Step 3: Connecting Power Optimizers in Strings

You can construct parallel strings of unequal length, that is, the number
of power optimizers in each string does not have to be the same. The
minimum and maximum string lengths are specified in the power
optimizer datasheets. Refer to the
 
 1. Connect the Minus (-) output connector of the string's first power optimizer to the
Plus (+) output connector of the string's second power optimizer.
 2. To minimize electromagnetic interference (EMI), make sure to minimize the distance
between the positive and negative DC cables.
For detailed instructions, see:
https://www.solaredge.com/sites/default/files/se-emi-performance-
application-note.pdf.
 3. Connect the rest of the power optimizers in the string in the same
manner.
WARNING!
If using a dual-input power optimizer and some inputs are not used, seal the
unused input connectors with the supplied pair of seals.
 4. If you intend to monitor the installation, using the monitoring platform, record the
StorEdge Three Phase Inverter MAN-01-00648-1.3
Chapter 2: Installing the Power Optimizers
Figure 3: Power optimizer connectors
Designer
for string length verification.
    19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge se7k-rwsStoredge se8k-rwsStoredge se10k-rws

Table of Contents