SolarEdge StorEdge SE5K-RWS Installation Manual page 36

Three phase inverter for europe and apac
Table of Contents

Advertisement

35
  Connecting the Energy Meter
 2. Open Communication Gland 2 and insert the other end of the communication cable
through the gland.
 
 3. Remove the 3-pin connector from the RS485-1 port on the communication board
and loosen its screws.
Figure 13: Meter Connection
StorEdge Three Phase Inverter MAN-01-00648-1.3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge se7k-rwsStoredge se8k-rwsStoredge se10k-rws

Table of Contents