Self-Test After Power Up; Self-Test Without Mt-100A Microterminal Connected - Colby Instruments PDL-100A Operating And Programming Manual

Programmable delay line
Table of Contents

Advertisement

Chapter 2
4. Push the flat rocker switch on the front panel to turn on the PDL-100A

2.0.2 Self-Test After Power Up

Both the MT-100A Microterminal and the PDL-100A System Unit each use a
embedded microprocessor to perform all necessary tasks. After you power up the
PDL-100A System Unit, both microprocessors will initiate a self-test.

2.0.3 Self-Test without MT-100A Microterminal connected

The PDL-100A will now check the calibration of the unit by slowly moving the
electromechanical trombone delay line towards its maximum setting (maximum
delay) until it reaches an infrared light barrier set at a precise position. A full-
speed test is then performed by moving the delay to 0 (relative) and then back to
625 ps and re-checking the calibration. If microwave relays are installed, a power
cycle to OFF, ON, then OFF of all relays will be performed. The delay is reset to
its zero delay (0 ps) position and the unit is ready to accept commands.
The PDL-100A is now ready to accept commands from any of the
attached interfaces (GPIB, TCP/IP, or RS-232).
© 2010 Colby Instruments. PDL-100A Operating and Programming Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
OFF / ON POWER BUTTON
System Unit.
Getting Started
Page 4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdl-100a-625psPdl-100a-1.25nsPdl-100a-10.0nsPdl-100a-20.0nsPdl-100a-100.0nsPdl-100a series

Table of Contents