Installation / Electrical Work - Wolf R1 Installation And Operating Instructions Manual

Table of Contents

Advertisement

Installation
Burner supply cable
Boiler sensor
High limit safety
cut-out
Earth terminal
Thermometer
Electrical work
Info
Power supply connection
3061809_1210

Installation / Electrical work

When installing this control unit ensure that sensor capillaries are
neither kinked nor twisted.
Never route on-site sensor and remote control leads / cables
together with mains power cables.
Implement the electrical wiring in accordance with the wiring
diagram.
Open the rear control unit cover after releasing both screws.
Burner supply cable
Guide it through the aperture in the control unit bracket (l.h. / r.h.),
subject to the side to which the boiler door opens.
Boiler sensor
Insert into any opening of the boiler sensor well.
High limit safety cut-out
Insert sensor capillaries into any opening in the boiler sensor
well.
Earth terminal
Insert into the control unit panel.
Thermometer for boiler water temperature display
Insert into any opening of the boiler sensor well.
Insert all plugs that are not used into the plug-in strip. Observe
the colour coding.
Join the power supply cable to the plug supplied. Insert the plug
into the marked-up location in the plug-in connector strip, and
secure the cable with its strain relief. Route the cable through the
boiler back cutout.
5

Advertisement

Table of Contents
loading

Table of Contents