AGT PSG BCR05 Installation Manual, Operating Manual, Maintenance Manual, Spare Part List page 8

Sample gas cooler
Table of Contents

Advertisement

Installation-, Operating-, Maintenance-Manual, Spare Part List
Assembly and Installation
Console-Set (optional)
All operations mentioned below to be performed by qualified personnel only.
The console-set ensures a save and stable mounting of the sample gas cooler. It is a complete set with
all needed installation and mounting materials. Notice the advices of the chapter „Installation Site".
Fasten mounting rails 1 and 2 in perfect vertical position at the wall. The fastening points 3 und 4
need an exact distance of 365mm.
Mount the console rails 5 and 6 with identical high in horizontal position. The high itself is
variable.
Fasten the sample gas cooler on the console rails. Therefore carefully dismount the right side
panel and the front panel of the sample gas cooler. Bold the bottom plate together with the
console rails. Therefore use the two bores in the front area of the bottom plate. Finally remount
all dismounted housing parts.
Mounting rail left
Mounting rail right
AGT-PSG GmbH & Co.KG
Errors and printing mistakes excepted
Fastening points left
Fastening points right
Console left 480mm
Console right 370mm
Translation - Manual BCR05 Rev. 06/2017
BCR05
Page 8

Advertisement

Table of Contents
loading

Table of Contents