Dantherm HCV 300 Manual page 30

Hide thumbs Also See for HCV 300:
Table of Contents

Advertisement

30
3
Open the duct connection (bot-
tom)
Locate the correct duct con-
nection at the bottom of the
unit (mode A or B) and bend
all four metal clamps.
Cut a hole along the indenta-
tion (dotted line) to create an
opening into the unit.
!
Try to cut along the inside line
of the indentation to avoid
damaging the duct connec-
tion. Do not attempt to break
the indentation and ensure
a complete cut through the
material has been achieved.
4
Connect the duct with a coupling as described on page 35 and secure both screws
with blind rivets to the metal clamps.
5
Calibrate the unit as described on page 37.
INSTALLATION & SERVICE MANUAL FOR PROFESSIONALS
Installation Options: Use the bottom outlet (HCV 300/400/460)
Mode A
Mode B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hcv 400Hcv 460Hcv 500Hcv 700

Table of Contents