14. Remove 2 outer retaining screws from transformer assembly, see Figure 5(b).
a
Figure 5.
Remove Transformer Assembly
15. Remove old transformer from enclosure.
16. Remove 2 outer retaining screws on top of the High Voltage cover panel,
see Figure 6(a).
17. Remove the High Voltage cover panel from enclosure.
18. Remove 2 inner retaining screws from Pentair
see Figure 6(b).
a
Figure 6.
Remove Lower Screws
19. Remove Pentair
20. Remove salt board if one exists.
21. Remove IntelliClor
b
control panel from enclosure.
®
circuit breaker.
®
b
control panel,
®