Step #3 – Assemble Base Pads to Legs
Locate the leg bundle or bundles and cut the bands to open it up. Locate the leg lift rods and
other components shown. Slide the end of the leg lift rod with the hole in it thru the channel
clamp and the adjustable leg tube as shown and secure with the hair pin cotter.
Note that the rods should be inserted in the same direction as that of the u-bolt. Slide the grip
onto the other end of the lift rod. Repeat this process on the remaining legs.
Midwest Industries, Inc.
Ida Grove, IA 51445
800-859-3028
www.shorestation.com
0004423
Page 3 of 19
Rev 2
Need help?
Do you have a question about the Manual SSV20100MS and is the answer not in the manual?