Download Print this page

IBM System p5 505 Quick Start Manual page 12

Advertisement

Press the front slide release latches
8.4
server into the rack cabinet and back out to verify that the server moves freely.
Tip: Use caution to avoid pinching your fingers between the release latch and
the rack flange as you move the server in and out of the rack.
Push the server all the way into the rack cabinet until the rack latches
8.5
into place.
Actual size
part 12J5289
8.6
Using a screwdriver, tighten the screws that you installed in steps 7 .7 through 7 .8.
If you are securing the server to the rack for transport, insert and tighten the two
8.7
F
screws
to secure the server into the rack.
You have finished installing the server onto the slide rail assemblies. Go to task 9
Install the cable-management arm.
D
on both sides of the server, and move the
E
F
E
click

Advertisement

loading

This manual is also suitable for:

9115-505