Leroy-Somer HPM 250 Installation And Maintenance Manual

Leroy-Somer HPM 250 Installation And Maintenance Manual

100x44 a.c. motor

Advertisement

Quick Links

3946 en - 06.2005 / a
HPM 250 - 100x44
A.C. motor
Installation and maintenance

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HPM 250 and is the answer not in the manual?

Questions and answers

Subash Esakkimuthu
May 10, 2025

how much weight

Summary of Contents for Leroy-Somer HPM 250

  • Page 1 3946 en - 06.2005 / a HPM 250 - 100x44 A.C. motor Installation and maintenance...
  • Page 2 3946 en - 06.2005 / a HPM 250 - 100x44 A.C. motor To ensure that the LEROY-SOMER motor you have just purchased is entirely satisfactory, it is essential to adhere to the following instructions. IMPORTANT: Contact with energised or rotating parts may cause injury.
  • Page 3 This dispensation will need to be confirmed on a case-by-case basis with LEROY-SOMER. If there is any vibration in the storage area, it is advisable to rotate the driving pulley at least twice a month (the brakes are Derating may be provided if special conditions are indicated released by the manual release system).
  • Page 4 LEROY-SOMER INSTALLATION AND MAINTENANCE 3946 en - 06.2005 / a HPM 250 - 100x44 A.C. motor 4 - COMMISSIONING 4.1 - Installation The installation must comply with the characteristics of the BEFORE INSTALLATION motor indicated on the nameplate (see section 1).
  • Page 5 LEROY-SOMER INSTALLATION AND MAINTENANCE 3946 en - 06.2005 / a HPM 250 - 100x44 A.C. motor 4.1.2 - Mechanical installation The HPM machine must be installed on a chassis or angle bracket that is not subject to vibration and must be secured using the fixings recommended in technical note T42.6.M018.
  • Page 6 LEROY-SOMER INSTALLATION AND MAINTENANCE 3946 en - 06.2005 / a HPM 250 - 100x44 A.C. motor 5 - MAINTENANCE/SERVICING It is the responsibility of the user to connect the motor in accordance with the current legislation and regulations in the country of use. This is particularly 5.1 - After one month’s operation...
  • Page 7 LEROY-SOMER INSTALLATION AND MAINTENANCE 3946 en - 06.2005 / a HPM 250 - 100x44 A.C. motor 6 - ORDERING SPARE PARTS To ensure optimum after-sales service, the following information must be provided with each spare parts order: - Type and serial number of the motor, and for each part: - Name and (or) reference number of the part - Quantity ordered.
  • Page 8 LEROY-SOMER 16015 ANGOULÊME CEDEX - FRANCE RCS ANGOULÊME N° B 671 820 223 S.A. au capital de 62 779 000 www.leroy-somer.com...