Drolet Heat Commander Installation And Operating Instructions Manual page 29

Table of Contents

Advertisement

Heat Commander Furnace Installation and Operation Manual
5.4.3 Minimum number of outlets and maximum lengths of ducts
-
A minimum of 6 start-off adapters must
be installed on the start-off plenum. The
location of the adapters has no impact
on the distribution of air.
-
Block the unused outlets with the block-off caps (B) and provided screws (D). Insert
the block-off under the plenum top.
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Df02003

Table of Contents