Installation; Pre Delivery Check; Delivery - C-Dax GoldLine Series Owner's Manual

Three point linkage sprayers
Table of Contents

Advertisement

Pre Delivery Check

Remove shrink-wrap then check major components for missing or damaged parts (remove any contents from
inside tank before filling)
-
Frame (with linkage pins and clips)
-
Tank
-
Lid
-
Filter
-
Pump (Hose tails tight)
-
Control unit and stand (clamps and hose tail tight) Gauge mount tight
-
Drive shaft
-
Suction filter (bowl tight)
-
Check spray pump oil level in pump sight glass (¼– ¾)
-
Check spray pump accumulator pressure (0-2 bar boom spraying, 2-6 bar handgun spraying)
-
Put water in tank (50-100 litres)
-
Ensure filter valve is open
-
Check for leaks in plumbing
Connect drive shaft to pump. NB Drive shaft length may need to be trimmed to suit client's tractors
-
-
If boom or hose reel is fitted, check mounting bolts for tightness
-
Ensure control unit pressure control is wound fully out (CCW) and dump valve set to 0 (dump position)
-
Run pump at 540 rpm
-
Ensure fluid flows in return line to tank and that there are no leaks
-
Turn lever on to I (pressure position)
-
Set Control unit pressure to 3 bar (45 psi) (See operating section for further control unit instructions)
-
Open valve to boom and allow fluid to flow until all air is expelled from spray line.
-
Ensure all nozzles spray evenly and there are no leaks
-
Shut off control unit valve and ensure all nozzles stop spraying and do not drip

Delivery

(Assuming above pre delivery check has been completed)
-
Fit sprayer to tractor
-
Put water in tank (50-100 litres)
-
Ensure filter valve is open
-
Check for leaks in plumbing
Connect drive shaft to pump. NB Drive shaft length may need to be trimmed to suit client's tractor(s).
-
Keep universals within specification. I.e. 15 Degree angle
-
Adjust top linkage length to level sprayer at normal operating height
-
Ensure control unit pressure control is wound fully out (CCW) and dump valve set to 0 (dump position)
-
Run pump at 540 rpm
-
Ensure fluid flows in return line to tank and that there are no leaks
-
Turn lever on to I (pressure position)
-
Set Control unit pressure to 3 bar (45 psi) (See operating section for further control unit instructions)
-
Open valve to boom or other spraying device, and allow fluid to flow until all air is expelled from spray line
-
Ensure all nozzles spray evenly and there are no leaks
-
Shut off control unit valve and ensure all nozzles stop spraying and do not drip

INSTALLATION

8

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GoldLine Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

600l goldline800l goldline1000l goldline1200l goldline

Table of Contents