Hide thumbs Also See for ProCore SR54:
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Description
No parts required
Hitch pin
Lynch pin
Hydraulic top link
Hydraulic hose—106 cm (3-1/2 ft)
Hydraulic hose—76 cm (2-1/2 ft)
Extension bracket
Rotational bracket
Hose quick couplings
Depth gauge
Slide block
Machine screw (#10 x 1/2 inch)
Screw (1/4 x 2-1/2 inch)
Tube clamp
Weld plate
Depth decal
Spring-loaded top link
Link pin
Lynch pin
No parts required
No parts required
PTO shaft
PTO shield
Pin (supplied with the PTO shaft)
Nut (supplied with the PTO shaft)
No parts required
Level (not supplied)
Tines (as required)
No parts required
Rear guard
Screw (3/8 x 3-1/4 inch)
Flat washer (0.438 x 1 inch)
Locknut
End cap
Qty.
Remove the aerator from the crating.
2
Connect the lower link arms (the SR54
and SR54-S aerators ship with the hitch
2
pins and lynch pins installed).
1
1
1
Connect the hydraulic top link (Models
SR54, SR70, and SR72).
2
1
2
1
1
2
Install the depth gauge.
2
1
1
1
1
Connect the upper link (Models SR54-S
3
and SR70-S).
3
Verify the top link setup.
Check the PTO angle.
1
Fit the PTO shaft.
1
Install the PTO shield.
1
Connect the PTO shaft.
1
Adjust the sway links.
1
Level the aerator side-to-side.
Install the tines.
Set the tine depth.
1
4
12
Install the rear guard.
4
2
7
Use

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents