Positioning - Swegon AQUA Link Installation, Use And Maintenance Manual

Table of Contents

Advertisement

2.4 POSITIONING

The following must be taken into account when choosing the unit place of installation and making relevant connections:
size and origin of the hydraulic piping;
location of the power supply;
accessibility for maintenance or repair operations;
strength of the supporting surface;
possible reverberation of sound waves.
The units are designed for installation in indoor technical premises. An outdoor installation model must be specifically
requested when ordering.
If the units are installed in indoor environments, it is necessary to ensure that the temperature of these rooms does not
fall below 4° C.
Provide a solid base on which to place the unit. This support must be perfectly flat and horizontal, and its size suitable
for that of the unit.
This precaution is essential when the unit is to be positioned on unstable ground (different types of soil, gardens, etc.).
Figure 2 shows what has been described.
15-20cm
Slab
Sealant
Cork gasket
Soil
9

Advertisement

Table of Contents
loading

Table of Contents